Piping inspection and supervision, explained from scratch

CertificationSign in

Try a material grade (A106), a standard (API 5L) or a term (hazardous area).

↑↓ navigate↵ openAll results & filters →

Section

Piping

The piping body of work, end to end: materials and specification, layout and supports, fabrication and welding, testing and erection, and in-service inspection.

Topics
53
Standards covered
93

Materials & specification

What a line is made of and how the specification says so. Pipe and plate materials, sizes and schedules, fittings, valves, flanges, gaskets and bolting — ending at the line class that pulls them together.

11 topics

Beginner

No prior knowledge assumed

01

Pipe materials — what the grade on the spec actually means

A106, A312, P11 — how to read a piping material grade, why carbon steel is the default, and what forces an upgrade to alloy or stainless.

BeginnerASTM A106ASTM A312+5
02

Plate materials — what vessels and tanks are actually made from

A516, A240, Monel, Hastelloy and titanium — why a plate specification is not a pipe specification, what each alloy is bought to survive, and why you almost never buy a solid exotic vessel.

BeginnerASTM A36ASTM A516+7
03

Pipe sizes and schedules — why NPS 2 is not 2 inches

NPS, DN and schedule numbers explained. Why the outside diameter is fixed, what changes when the schedule goes up, and how to read a pipe size chart.

BeginnerASME B36.10MASME B36.19M+1
04

Line sizing — why pipe diameter is an economic decision

The two criteria that size every line, why a bigger pipe costs once and a smaller one costs forever, and the lines where neither rule applies.

BeginnerASME B31.3API 14E
05

Fittings and branch connections — how a pipe changes direction

Elbows, tees, reducers and caps, and the branch fittings that take a small line off a big one. What each is for, why the dimensions are fixed, and why a branch needs reinforcement.

BeginnerASME B16.9ASME B16.11+3
06

Valve types — picking one for the duty, not the drawing

Gate, globe, ball, butterfly and check valves explained by what each is built to do. Why throttling with a gate valve destroys it, what double block and bleed means, and how check valves slam.

BeginnerASME B16.34API 600+5

Intermediate

Builds on the basics

Advanced

Design and compliance detail

Layout & supports

Where the line runs and what holds it up. Supports and restraint, expansion loops and joints, spring hangers, nozzle loads, pump piping, plot plan and the access a line needs to be maintained.

11 topics

Intermediate

Builds on the basics

01

Pipe supports and thermal expansion — why you cannot just bolt it down

Hot pipe grows, and it grows with enormous force. How expansion is calculated, why loops exist, what anchors, guides and spring hangers actually do, and how supports protect equipment nozzles.

IntermediateASME B31.3ASME B31.1+4
02

Expansion loops and offsets — sizing the detour that absorbs the growth

How a loop actually absorbs movement, the guided cantilever hand calculation that gives you a first size, why the answer never fits the rack, and the honest ranking of what to do when it does not.

IntermediateASME B31.3ASME B31.1+2
05

Pipe support standards and details — reading SP-58, SP-69 and a project detail sheet

What the support standards actually fix, why a project standard detail is a specification rather than a catalogue, the welded attachment problem on alloy and sour service, shoes and trunnions and shields, and what goes wrong when a support is left to the field.

IntermediateMSS SP-58MSS SP-69+4
08

Pump piping layout — the suction side is where the decisions are made

NPSH available as a consequence of layout rather than a number handed to you. Eccentric reducers and the pocket they prevent, straight run before the impeller, the elbow that must not be in the shaft plane, parallel pump symmetry, strainers, minimum flow, and the discharge order.

IntermediateAPI 610API 686+1
09

Plot plan and equipment spacing — the drawing everything else inherits

What actually sets the distance between equipment, the four drivers that pull against each other, the pipe rack as the spine and how its tiers are allocated, prevailing wind and fired equipment, roads and containment, and why a plot plan mistake cannot be recovered downstream.

IntermediateOISD-STD-118API 752+3
10

Access, operability and maintenance space — what the plant is judged on afterwards

Valve reach and stem orientation, why a chain operator is a confession, platforms and the dead-end with one ladder, headroom, bundle pull and rotor withdrawal, drop-out areas and davits, and the model review that is the last chance to find any of it.

IntermediateOISD-STD-118ASME B31.3+2

Advanced

Design and compliance detail

03

Expansion joints and bellows — pressure thrust and why they are the last resort

What a bellows can and cannot absorb, the pressure thrust that dwarfs the thermal force it was fitted to relieve, tied and hinged and gimbal arrangements, guide spacing, cycle life, and the installation errors that kill them early.

AdvancedEJMAASME B31.3+2
04

Anchors, guides and restraint schemes — deciding where the pipe may move

A restraint scheme is one decision for a whole run, not a scatter of supports. Where an anchor belongs, what it actually carries once friction is counted, line stops against full anchors, the gap that is the design, and the accidental anchors that site creates.

AdvancedASME B31.3ASME B31.1+3
06

Spring hanger selection — variable, constant, and the pin nobody pulled

Choosing a spring for a line that moves vertically. Hot and cold load, the load variation limit and when it forces a constant effort unit, travel and rod swing, why the pointer is the most useful thing on a walkdown, and the installation errors that make a spring worse than no spring.

AdvancedMSS SP-58MSS SP-69+3
07

Nozzle loads and allowables — the constraint that really governs hot piping

Why machine nozzle allowables are so small, where they come from for pumps, compressors, turbines and vessels, what exceeding them actually does, why the symptom surfaces in somebody else's report, and the design and field rules that prevent it.

AdvancedAPI 610API 617+5
11

Relief valve and flare piping — the 3 per cent rule, backpressure and reaction force

The piping engineer's half of overpressure protection. Why a relief valve inlet must be short and generous, what chatter actually is, built-up and superimposed backpressure and the 10 per cent limit, reaction force on an open discharge, flare header slope, and the car-sealed valve that must never be closed.

AdvancedAPI 520API 521+3

Fabrication, welding & NDE

How a joint is made and how it is proved. Welding processes, WPS and PQR, Section IX variables, welder qualification, fit-up and heat treatment, non-destructive examination and the test plans that govern them.

11 topics

Intermediate

Builds on the basics

01

Welding processes, WPS and NDT — what happens before an arc is struck

SMAW, GTAW, GMAW and the rest, explained by what they are good at. Then the paperwork that makes a weld legal — WPS, PQR and welder qualification — and how welds are inspected.

IntermediateASME Section IXASME B31.3+2
02

Reading a WPS and a PQR — what is on the sheet and what the tests proved

The practical document skill — what each field on a welding procedure specification is for, what a qualification record actually recorded, and what tensile, bend, impact, macro and hardness results each demonstrate about the joint.

IntermediateASME Section IXASME Section II Part C+2
04

Welder qualification and continuity — the ranges a ticket covers, and the register nobody updates

What a welder performance qualification actually establishes, the ranges it carries in thickness, diameter, position and process, how continuity lapses at six months, and why the expired ticket is always found after the weld is made.

IntermediateASME Section IXASME B31.3+2
05

Joint preparation and fit-up — the hold point you only get once

Bevels and root gaps, internal misalignment and the limits on it, why trimming or counterboring is allowed where grinding the bore is not, tack welds as part of the final weld, and what an inspector checks in the minutes before the root goes in.

IntermediateASME B31.3ASME B16.25+2
07

Non-destructive examination — choosing the method and reading the result

Why every NDE method is blind to something, what magnetic particle cannot do on stainless, why ultrasonics can miss a crack lying the wrong way, the difference between an indication and a defect, and why the examiner's qualification is part of the result.

IntermediateASME Section VASME B31.3+2
09

Inspection and test plans — hold, witness, review, and who signs

What an ITP actually is, how it is built line by line from the code and the specification, what each of the four intervention levels obliges, why a document full of hold points is worse than a short one, and the notification failure that turns a witness point into nothing.

IntermediateASME B31.3ISO 9001+2
10

Non-conformance and corrective action — the four dispositions, and why NCRs repeat

Writing an NCR somebody can act on, the difference between rework, repair, use-as-is and reject, who may grant a concession, and why closing non-conformances one at a time without ever raising a corrective action guarantees the same defect next week.

IntermediateISO 9001ASME B31.3+2
11

Inspector competence and certification — who may interpret, and who only operates

SNT-TC-1A as an employer's written practice rather than a certificate, ISO 9712 as the independent route, what Levels I, II and III may each do, and why the inspector's own qualification is the first thing a client audits.

IntermediateASNT SNT-TC-1AISO 9712+2

Advanced

Design and compliance detail

Testing, erection & supervision

Getting the line installed and signed off. Isometrics to installed spools, rigging and scaffold, pressure test packs, tie-ins and shutdown windows, progress measurement and the site records that support a claim.

12 topics

Beginner

No prior knowledge assumed

Intermediate

Builds on the basics

01

From isometric to installed line — fabrication, erection and testing

How to read a piping isometric, why spool breaks decide what happens in the shop and what happens at height, and the test and reinstatement sequence that gets a line handed over.

IntermediateASME B31.3ASME B16.25+1
02

Erection sequence and constructability — why the isometric order is not the build order

Why the number on an isometric says nothing about what has to be built first, how access is lost and regained, the dependencies that decide a piping sequence, and the habit of working backwards from the date that cannot move rather than forwards from today.

IntermediateEN 12811-1ISO 21508
03

Spool handling and temporary support — the hours between landed and supported

The period in which a spool has been released by the crane but does not yet have the supports it was designed to have, why that state has no design behind it, what has to be established before the hook comes off, and why Friday afternoon is when pipe ends up on the floor.

IntermediateASME B30.9ASME B30.26+1
04

Lift plans and rigging basics — sling angle, centre of gravity, and the reasons to stop

What a lift plan has to state before anybody touches a spool, why the tension in a sling leg is not the load divided by the number of legs, how an offset centre of gravity behaves, and the short list of conditions under which a supervisor stops a lift regardless of who is waiting.

IntermediateASME B30.9ASME B30.5+2
06

Pressure test packs and reinstatement — the gate, and what gets put back afterwards

What a test pack contains and why it is built as the work proceeds, the procedure and the calibrated gauge, the falling pressure that is temperature rather than a leak, and the reinstatement register that is what actually keeps a tested system honest.

IntermediateASME B31.3ASME B16.5+2
08

Diameter-inch and progress measurement — the unit piping is paid in

What a diameter-inch is and how it is counted, why it under-represents small bore, the difference between claimed and earned progress, the measurement rule that has to be agreed before work starts, and why the last ten per cent of a piping package takes months.

IntermediateISO 21508
09

Construction productivity factors — why the same weld takes three times as long

Why a norm measured in the shop does not survive contact with a live unit, the conditions that multiply the hours without changing the work, crew composition and what a waiting welder costs, and the difference between a crew that is busy and a crew that is producing.

IntermediateISO 21508
10

Supervising under a permit — the shift you signed for

Not what a permit is, which is covered elsewhere and free, but what changes when you are the person who signed it — what to verify at the work rather than on the form, the conditions routinely accepted and not met, why a gas test expires, and what handing back actually requires.

IntermediateASME B31.3
11

Site records and the daily diary — writing for somebody who will not believe you

Why the site diary is the most valuable document a supervisor produces, what distinguishes an entry that is evidence from one that is worthless, what to record every day regardless, and why contemporaneous matters more than detailed.

IntermediateISO 21508
12

Variations, backcharges and notice — the difference between noticing and notifying

How to recognise an instruction that is really a variation, why the entitlement usually depends on the notice rather than the change, what a backcharge is and how it runs in both directions, and the one-sentence note that protects a position without starting an argument.

IntermediateISO 21508

Advanced

Design and compliance detail

Inspection & integrity

The forty years after handover, and the core of the API 570 syllabus. Damage mechanisms, corrosion loops and circuits, integrity operating windows, and risk-based inspection from assessment to recommendation.

8 topics

Intermediate

Builds on the basics

Advanced

Design and compliance detail

Standards referenced in this section