Expansion loops and offsets — sizing the detour that absorbs the growth
How a loop actually absorbs movement, the guided cantilever hand calculation that gives you a first size, why the answer never fits the rack, and the honest ranking of what to do when it does not.
Anchors, guides and restraint schemes — deciding where the pipe may move
A restraint scheme is one decision for a whole run, not a scatter of supports. Where an anchor belongs, what it actually carries once friction is counted, line stops against full anchors, the gap that is the design, and the accidental anchors that site creates.
Pump piping layout — the suction side is where the decisions are made
NPSH available as a consequence of layout rather than a number handed to you. Eccentric reducers and the pocket they prevent, straight run before the impeller, the elbow that must not be in the shaft plane, parallel pump symmetry, strainers, minimum flow, and the discharge order.
Plot plan and equipment spacing — the drawing everything else inherits
What actually sets the distance between equipment, the four drivers that pull against each other, the pipe rack as the spine and how its tiers are allocated, prevailing wind and fired equipment, roads and containment, and why a plot plan mistake cannot be recovered downstream.
Access, operability and maintenance space — what the plant is judged on afterwards
Valve reach and stem orientation, why a chain operator is a confession, platforms and the dead-end with one ladder, headroom, bundle pull and rotor withdrawal, drop-out areas and davits, and the model review that is the last chance to find any of it.
Relief valve and flare piping — the 3 per cent rule, backpressure and reaction force
The piping engineer's half of overpressure protection. Why a relief valve inlet must be short and generous, what chatter actually is, built-up and superimposed backpressure and the 10 per cent limit, reaction force on an open discharge, flare header slope, and the car-sealed valve that must never be closed.
Plant layout, paving and drainage — decisions you cannot undo later
What a plot plan is actually deciding, why paving and slopes matter more than they look, and why a plant has four separate drainage systems that must never meet.