ASME
ASME Section II Part C
Specifications for Welding Rods, Electrodes and Filler Metals
The filler metal specifications that a WPS points at, and the source of the A-number and F-number groupings Section IX uses to decide what a procedure qualification covers. Also where the storage and baking requirements for low-hydrogen electrodes come from, which is the part that matters on a humid site.
This is an explanation, not the standard. PipingInspector is not affiliated with ASME and reproduces no part of the document. Always work to the current edition of the standard itself and to your project specification.
