Piping inspection and supervision, explained from scratch

CertificationSign in

Try a material grade (A106), a standard (API 5L) or a term (hazardous area).

↑↓ navigate↵ openAll results & filters →

Pass

Process

One of the parallel flow paths through a fired heater. Flow must be balanced pass by pass — a single restricted pass overheats and can rupture while the total flow, and every bulk measurement, still looks entirely normal. Hence low flow trips per pass rather than on the total.

Explained in depth

Related terms

← All 148 terms