Piping inspection and supervision, explained from scratch

CertificationSign in

Try a material grade (A106), a standard (API 5L) or a term (hazardous area).

↑↓ navigate↵ openAll results & filters →

Design case

Process

The worst credible combination a piece of equipment must still handle — maximum throughput, worst ambient, end-of-run fouling — as opposed to the normal case a PFD usually shows. Different items are governed by different cases, so 'what case is this sized for?' is always worth asking.

Explained in depth

Related terms

← All 148 terms