Piping inspection and supervision, explained from scratch

CertificationSign in

Try a material grade (A106), a standard (API 5L) or a term (hazardous area).

↑↓ navigate↵ openAll results & filters →

Fire watch

Process

A person whose only task is watching for ignition during hot work and for a defined period after it stops. The delay matters — sparks and hot slag can lodge somewhere and develop slowly, so the window after the tools are put away is a real hazard rather than a formality.

Explained in depth

Related terms

← All 148 terms