Piping inspection and supervision, explained from scratch

CertificationSign in

Try a material grade (A106), a standard (API 5L) or a term (hazardous area).

↑↓ navigate↵ openAll results & filters →

PWHT

Post-Weld Heat Treatment

Piping

Heating a completed weld, holding it, then cooling it slowly. Relieves residual stress, tempers a hard heat-affected zone and drives off hydrogen. ASME B31.3 sets when it is mandatory; in sour service it is often required regardless, to bring weld hardness under the NACE limit.

Explained in depth

Related terms

← All 148 terms